{"id":50464,"date":"2026-02-18T11:05:35","date_gmt":"2026-02-18T11:05:35","guid":{"rendered":"https:\/\/www.archtam.com\/projects\/driving-development-r573-moloto-road-section-2-upgrade\/"},"modified":"2026-02-26T09:56:18","modified_gmt":"2026-02-26T14:56:18","slug":"driving-development-r573-moloto-road-section-2-upgrade","status":"publish","type":"project","link":"https:\/\/www.archtam.com\/projects\/driving-development-r573-moloto-road-section-2-upgrade\/","title":{"rendered":"Driving\u00a0development:\u00a0R573\u00a0Moloto Road\u00a0Section 2\u00a0upgrade\u00a0"},"content":{"rendered":"\n<div class=\"aecom-custom-block block-intro-text\" style=\"margin-top: 0px; margin-bottom: 40px\">\n    <p class=\"editor-emphasized\">\n        ArchTam was appointed to provide comprehensive consulting engineering services, covering the entire R573 Moloto Road Section 2 Upgrade project lifecycle from the assessment and reporting stage to design, tender documentation, contract administration and close-out. This project involves road upgrade between Moloto and Moteti, entailing the construction of approximately 49 km of new carriageway, significantly enhancing safety and mobility.     <\/p>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><strong>ArchTam\u2019s role<\/strong>\u00a0<\/h2>\n\n\n\n<p>ArchTam\u2019s scope of work is to redesign the&nbsp;existing&nbsp;road as two lanes in either direction, along with public transport facilities. It includes widening five river bridges, ten major culverts and three pedestrian bridges. In addition, a median barrier will be constructed as a major accident-prevention measure, along with street lighting to improve visibility.&nbsp;<\/p>\n\n\n\n<p>The fact that the road is being upgraded from Category 3 to Category 2 means that the existing bulk stormwater system&nbsp;immediately&nbsp;adjacent and outside the R573 road reserve cannot cope with the design peak flows. As such, these systems also need to be upgraded&nbsp;in order to&nbsp;mitigate flooding.\u202f This has&nbsp;necessitated&nbsp;additional&nbsp;major culverts, bulk stormwater&nbsp;channels&nbsp;and low-level crossings.&nbsp;ArchTam also needed to reinstate access and provide road linkages to the new intersections, mainly&nbsp;as a result of&nbsp;cutting off indirect accesses onto the R573, so that this then becomes part of the overall road network. The access roads and bulk stormwater drainage forms part of&nbsp;corresponding&nbsp;community development projects.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Environmental,\u00a0social and\u00a0governance\u00a0commitment<\/strong>\u00a0<\/h2>\n\n\n\n<p>To improve efficiency, the project&nbsp;utilized&nbsp;the existing in-situ material from the original single carriageway road for a&nbsp;portion&nbsp;of the&nbsp;layerworks&nbsp;for the new widening, as well as locally available&nbsp;commercial material sources. Utilising existing material is a fundamental approach to ensuring environmental sustainability in terms of&nbsp;optimum&nbsp;usage of existing materials.&nbsp;<\/p>\n\n\n\n<p>The main works contracts made provision for a&nbsp;minimum&nbsp;30% Contract Participation Goals (CPG) target to Targeted Enterprises and SMMEs.&nbsp;The tender was originally awarded on the basis that there will only be two main works contracts. It has since developed into one priority works contract&nbsp;and&nbsp;five main works&nbsp;contracts.&nbsp;Of&nbsp;these, one Main Works Package A,&nbsp;is nearing completion with&nbsp;ArchTam providing construction administration and monitoring of this&nbsp;Works Contract.&nbsp;In addition to this a&nbsp;component&nbsp;of the works and design philosophy was to improve pedestrian safety through the provision of sidewalks in the urban\/ peri-urban areas as well as formalised crossing points along the entire route and the construction of pedestrian bridges. For the community development&nbsp;projects&nbsp;the focus is to reinstate&nbsp;access to properties&nbsp;affected by the main road upgrade,&nbsp;taking into&nbsp;considering&nbsp;spatial constraints and how this tied into the overall access management plan and upgrades to the adjacent road network.&nbsp;This was achieved&nbsp;by formalising indirect accesses and developing the formal street network.&nbsp;The community development projects&nbsp;centred around these local accesses&nbsp;and associated bulk stormwater infrastructure upgrades&nbsp;and included the use of&nbsp;labor-intensive&nbsp;construction techniques and materials to construct these access roads, where possible.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Digital\u00a0innovation<\/strong>\u00a0<\/h2>\n\n\n\n<p>As part of the construction monitoring phase of the Priority Works contract,\u00a0ArchTam\u00a0utilized\u00a0advanced digital tools such as BIM 360 and ArcGIS for construction monitoring and management\u00a0of the Priority Works contract.\u00a0Key innovations included\u00a0data captured and shared in cloud-based Common Data Environments (CDE) from construction sites to ArchTam office locations.\u00a0Three digital workflows were upgraded including daily site diaries using ESRI mobile apps,\u00a0geo-located site progress photos captured via ESRI GIS apps and inspection along\u00a0with\u00a0approval requests\u00a0ran on the Autodesk BIM 360 Field platform.\u00a0Drone technology was used to collect real-time project data to track construction progress.\u00a0To\u00a0leverage\u00a0the value of all this captured data, ArchTam implemented data-driven digital dashboards to\u00a0assist\u00a0with visual analytics of weekly activities on-site.\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Project\u00a0management\u00a0<\/strong>\u00a0<\/h2>\n\n\n\n<p>ArchTam provided planning and management of traffic during construction through half-width construction of the R573 while\u00a0maintaining\u00a0full traffic flow. This\u00a0is\u00a0facilitated\u00a0by utilizing a temporary\u00a0road widening\u00a0and constructing the new carriageway, while the original carriageway was used to accommodate traffic. Upon completion of the new carriageway, traffic\u00a0is\u00a0then moved over to the newly constructed carriageway while the existing carriageway\u00a0is\u00a0rebuilt. Of\u00a0primary\u00a0importance\u00a0is to ensure\u00a0continued mobility and accommodation of traffic during construction.\u00a0<\/p>\n","protected":false},"author":1034,"featured_media":50466,"template":"","tags":[],"city":[],"class_list":["post-50464","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/project\/50464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/users\/1034"}],"version-history":[{"count":1,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/project\/50464\/revisions"}],"predecessor-version":[{"id":50465,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/project\/50464\/revisions\/50465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/media\/50466"}],"wp:attachment":[{"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/media?parent=50464"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/tags?post=50464"},{"taxonomy":"city","embeddable":true,"href":"https:\/\/www.archtam.com\/wp-json\/wp\/v2\/city?post=50464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}